There will be changed traffic conditions on the Princes Highway south of Nowra over the coming weeks as utility and ground surveys take place next to highway as part of design work on the Jervis Bay Road to Sussex Inlet Road upgrade.
Subscribe now for unlimited access.
$0/
(min cost $0)
or signup to continue reading
Workers may be in the area from Thursday (May 27) until late August between 7pm and 5am and also 7am and 6pm Monday to Friday, weather permitting.
A reduced speed limit of 40km/h will be in place and road shoulders will be closed at these specific sections of the highway while surveys are being undertaken.
Read more:
Traffic control will be in place intermittently and only along small sections of the highway at a time, with crews aiming to avoid working during peak travel times where possible.
Motorists are advised to allow for delays of up to five minutes, drive to the conditions and follow the directions of signs and traffic control.
Transport for NSW thanks road users for their patience during this time.
For the latest traffic updates download the Live Traffic NSW App, visit livetraffic.com or call 132 701.
For more information on the Jervis Bay Road and Sussex Inlet Road Upgrade Project visit nswroads.work/jb2si